| The instructions below provides guidance for contractors with the Workscope Submission step. The Workscope Submission will be assigned to the Contractor who accepted the Enrollment Acceptance step. |
Aura - Tab Group |
---|
settings | {"generalSettings":{"tabSpacing":0,"tabWidth":50,"tabHeight":40,"direction":"vertical"},"activeSettings":{"backgroundColor":{"color":"#002d72"},"text":{"fontSize":16,"color":"#fff","textAlign":"left","fontWeight":"normal"}},"inactiveSettings":{"backgroundColor":{"color":"#f4f5f7"},"text":{"fontSize":16,"color":"#5e6c84","textAlign":"left","fontWeight":"normal"}},"contentSettings":{"backgroundColor":{"color":"#fff"},"border":{"style":"solid","width":2,"top":false,"bottom":false,"left":true,"right":false,"color":"#002d72"},"padding":{"top":10,"right":10,"bottom":10,"left":10}},"hoverSettings":{"backgroundColor":{"color":"#0073a4"},"text":{"fontSize":16,"color":"#ffffff","textAlign":"left","fontWeight":"normal"}}} |
---|
tab | 1 |
---|
|
Aura - Tab |
---|
title | Applicant Information |
---|
|
Panel |
---|
borderColor | #002D72 |
---|
bgColor | #F3F4F9 |
---|
titleColor | #ffffff |
---|
borderWidth | 1 |
---|
titleBGColor | #002D72 |
---|
borderStyle | none |
---|
title | Workscope Submission - Applicant Information |
---|
|
|
Info |
---|
When the Workscope Submission is in the New status, complete the following on the Applicant Information tab. |
UI Steps |
---|
|
UI Step |
---|
Input/select the Additional Applicant Information and Owner Information fields. Tip |
---|
The fields will be prepopulated by the Salesforce API call when the enrollment is created. If the contractors leave outcome as Accepted, they should review this page, including the Project Type. Tip |
---|
If the contractor selects Rejected from the Outcome, they will be required to select a reason and add a note to the Notes tab explaining in as much relevant detail as needed to help CLEAResult know what to do with the enrollment when it is pushed back to them to select an alternate contractor. If contractor select OnHold from the Outcome, they will be required to select a reason. Once Save is clicked, two new fields will appear in the On Hold Information section to document the reason for the hold and include a reminder date that will allow the system to send an email notification on that date to the contractor who placed the enrollment on hold. Enrollments on hold cannot be processed until the hold is removed. |
Warning | . Warning |
---|
Proceed if the Project Type is set as Full Comprehensive or Muni Install. Audit Proceed if the Project Type is set as Full Comprehensive or Muni Install. Audit Install is for non invasive measures, unless you are able to obtain the landload approval, in which case the Project Type can be changed to Full Comprehensive. No project should be changed to a Muni Install unless directed by NYSERDA or CLEAResult. |
Expand |
---|
| Image Modified |
|
UI Step |
---|
Once all of the required tabs are filled out, click the Save button and move on to the Usage & Fuel Information tab. |
|
|
Aura - Tab |
---|
|
Panel |
---|
borderColor | #002D72 |
---|
bgColor | #F3F4F9 |
---|
titleColor | #ffffff |
---|
borderWidth | 1 |
---|
titleBGColor | #002D72 |
---|
borderStyle | none |
---|
title | Workscope Submission - Usage & Fuel Information |
---|
|
|
Info |
---|
The instruction below provides guidance for contractors to complete the Usage & Fuel tab. Information in the Utility Information section on this tab will come from the Combined Residential Application for EmPower+ Enrollments but can be updated or changed if needed. |
Section |
---|
Column |
---|
|
UI Steps |
---|
|
UI Step |
---|
On the Usage & Fuel tab, fill in all of the required fields that contains two ** (asterisk). Tip |
---|
Some of the non-editable fields on this tab are calculated based on information added to editable fields. |
|
UI Step |
---|
Once all of the required fields are complete, click the Save button to save the Usage & Fuel information. |
|
|
Column |
---|
| Image Modified |
|
|
Aura - Tab |
---|
|
Panel |
---|
borderColor | #002D72 |
---|
bgColor | #F3F4F9 |
---|
titleColor | #ffffff |
---|
borderWidth | 1 |
---|
titleBGColor | #002D72 |
---|
borderStyle | none |
---|
title | Workscope Submission - Existing Conditions |
---|
|
|
Info |
---|
The instruction below provides guidance for contractors to complete the Existing Conditions tab. Benefit to completing this information upfront will provide us pre-filled information in the Measures tab. Any insulation areas that will be proposed for improvement must have the corresponding Existing Condition filled out (ie. If they are proposing garage ceiling insulation, they must fill in the garage ceiling fields in existing conditions). |
Section |
---|
Column |
---|
|
UI Steps |
---|
|
UI Step |
---|
On the Existing Conditions tab, fill in all of the required fields that contains two ** (asterisk). Tip |
---|
The first two fields are preset and not editable for EmPower+ Enrollments. If the Needs Improvment option is selected under the Summary Section, you would be required to add at lease 1 associated Measure on the Measures tab to address the condition. |
|
UI Step |
---|
Once all of the required fields are complete, click the Save button and move on the Parner Information tab. Warning |
---|
Some fields on this screen become Conditionally Required based on responses to previous fields. Those Conditionally Required fields will not include a **. Conditionally Required fields are often fields that will appear based on responses to previous fields. If you try to process the step without completing those Conditionally Required fields, the system will prevent you from processing the step until you complete those fields. |
|
|
|
Column |
---|
| Image Modified |
|
|
Aura - Tab |
---|
|
Panel |
---|
borderColor | #002D72 |
---|
bgColor | #F3F4F9 |
---|
titleColor | #ffffff |
---|
borderWidth | 1 |
---|
titleBGColor | #002D72 |
---|
borderStyle | none |
---|
title | Workscope Submission - Partner Information |
---|
|
|
Info |
---|
The instruction below provides guidance for contractors to complete the Partner Information tab. |
Section |
---|
Column |
---|
|
UI Steps |
---|
|
UI Step |
---|
On the Partner Information tab, choose an option under the Choose one of the following drop-down list. Tip |
---|
Depending on the option selected, additional required fields will become visible. |
|
UI Step |
---|
Fill in all of the required fields that contains two ** (asterisk). Tip |
---|
Depending on the option you select, you may have to respond to additional questions. |
|
UI Step |
---|
Once all of the required fields are complete, click the Save button and move on the to Other Information tab. |
|
|
Column |
---|
| Image Modified |
|
|
Aura - Tab |
---|
|
Panel |
---|
borderColor | #002D72 |
---|
bgColor | #F3F4F9 |
---|
titleColor | #ffffff |
---|
borderWidth | 1 |
---|
titleBGColor | #002D72 |
---|
borderStyle | none |
---|
title | Workscope Submission - Other Information |
---|
|
|
Info |
---|
The instruction below provides guidance for contractors with the Workscope Review Validation field group in the Other Information tab. Workscope Review Validation is to help the Contractor understand if the enrollment will be required to undergo a Manual Review by CLEAResult. It is suggested to return back to this tab before processing to confirm if changes made to other tabs will effect the Manual Review requirement. |
Section |
---|
Column |
---|
|
UI Steps |
---|
|
UI Step |
---|
On the Other Information tab, locate the Workscope Review Validation field group. Warning |
---|
The 2nd, 3rd, and 4thdrop downs all deal with the State Historical Preservation Office. If Yes is selected for those drop-downs, the All SHPO Questions are Yes validation will turn into a yes. In this case, a manual review by CLEAResult will be required and the contractor will be required to upload the SHPO form as well. |
|
UI Step |
---|
If any of the Workscope Review Validations indicate Yes, it signifies that this enrollment will be required to undergo a Manual Review by CLEAResult before you can begin the Final Project Submission. |
UI Step |
---|
If all of the Workscope Review Validations indicate No, the workscope will be auto-approved and work may proceed. The NYHEP will move the project to Final Project Submission. Tip |
---|
If you would still like ClearResults to provide a manual review, select the Yes option under the Send Project to Manual Review? drop-down. |
|
UI Step |
---|
If the Project Type is Audit Install, the Final Project Review step will be generated next. |
UI Step |
---|
Once all of the required fields are filled out, click the Save button and move on to the Notes or Documents tab tab. |
|
|
Column |
---|
| Image Modified |
|
|
Aura - Tab |
---|
|
Panel |
---|
borderColor | #002D72 |
---|
bgColor | #F3F4F9 |
---|
titleColor | #ffffff |
---|
borderWidth | 1 |
---|
titleBGColor | #002D72 |
---|
borderStyle | none |
---|
title | Workscope Submission - Notes |
---|
|
|
Excerpt Include |
---|
| NY Home Energy Portal Overview |
---|
| NY Home Energy Portal Overview |
---|
nopanel | true |
---|
|
|
Aura - Tab |
---|
|
Panel |
---|
borderColor | #002D72 |
---|
bgColor | #F3F4F9 |
---|
titleColor | #ffffff |
---|
borderWidth | 1 |
---|
titleBGColor | #002D72 |
---|
borderStyle | none |
---|
title | Workscope Submission - Documents |
---|
|
|
Info |
---|
The instructions instruction below provides guidance for contractors guidances on how to upload documents. The required Document Types are listed under the Required column with red exclamation mark.document(s) within an enrollment. A red exclamation mark will be displayed under the Required column indicating the document type being a Required Document. Multiple documents can be uploaded at the same time: PC Users: CTRL + Click Mac Users: Command + Click |
UI Steps |
---|
|
UI Step |
---|
To upload a Document, access the enrollment's Documents tab during any step. |
UI Step |
---|
Click the New button for the Document dialog will open |
| UI Expand |
---|
title | Upload Mutilple Documents |
---|
| UI Steps |
---|
| UI Step | On the Document tab, click the New button at the top of the Documents tab. Expand |
---|
| Image Removed Image Added |
|
UI Step |
---|
Click Browse to select a file to upload. Tip |
---|
Multiple documents can be uploaded at the same time.The Upload Documents dialog will open. You will need to select the Document Type for every file you choose in the Upload Documents dialog. When finished, click Save. |
Expand |
---|
| Image Removed |
|
| UI Expand |
---|
title | Upload Single Document |
---|
| Image Added |
|
UI Steps |
---|
| UI Step |
---|
On After the file is uploaded for the Document tabType, click the Edit button icon in that Document Type’s row, the Document dialog will open Save and then click Close to upload the file and close the dialog. Tip |
---|
After you’ve selected a file, you can remove it by clicking the x Remove button. |
Warning |
---|
This is the Contractors last opportunity to click Remove to not upload a specific document. Once Save is clicked, the document becomes a public record and it cannot be edited, deleted, or otherwise overwritten. If the wrong document is uploaded, Contractors will need to upload the correct document and use the Comments fields to let both CLEAResult and NYSERDA know which is the correct document to review | Expand |
---|
| Image Removed |
UI Step |
---|
Click Browse to select a file to upload. Tip |
---|
After you’ve selected a file, you can remove it by clicking the x Remove button. |
Expand |
---|
| Image Removed |
UI Step |
---|
After the file is uploaded for the Document Type, click Save and then click Close to upload the file and close the dialog. |
Expand |
---|
| Image Removed Image Added |
|
UI Step |
---|
To download and view an uploaded document, click the Document Name Hyperlink. Expand |
---|
| Image Modified |
|
|
|
Aura - Tab |
---|
|
Panel |
---|
borderColor | #002D72 |
---|
bgColor | #F3F4F9 |
---|
titleColor | #ffffff |
---|
borderWidth | 1 |
---|
titleBGColor | #002D72 |
---|
borderStyle | none |
---|
title | Workscope Submission - Measures |
---|
|
|
Info |
---|
The instruction below provides guidance for contractors to complete the required data entry fields when adding measures to the Workscope Submission step. Some measures will automatically be added to the Measures tab. For measures that are automatically added, they should NOT be deleted. If any of those are deleted, Contractors will have to the Workscope Submission step.Three measures will be added to the Workscope Submission step by default. Do not delete these measures and complete the required data entry fields for these measuresmanually add them back otherwise the system will not allow the Contractor to process the step. For a full list of all program measures that may help with this tab, please access the NY HEP Measures List. |
UI Steps |
---|
|
UI Step |
---|
On the Measures tab, click the the Add Measures button button. The Add Measures dialog will open. Expand |
---|
| Image Modified |
|
UI Step |
---|
To select one or more measures to add to the step, check the box in the left-hand column. To add the selected measures to the step, click the the Save button button in the dialog. Tip |
---|
If you increase the the No. to Add value value after selecting the measure, the system will add that many unique instances of the measure to the Add Measure stepMeasure step. |
Expand |
---|
| Image Modified |
|
UI Step |
---|
After you add one or more measures to the step, enter each measure’s P Qty (planned quantity) or I Qty (installed quantity) if it is not prepopulated. Then, click anywhere on the section to complete the data entry fields for each measure. Tip |
---|
Required fields are denoted with with **. After all the measures are added and all the data entry fields are filled out, the Appliance Request step can be processed. |
Expand |
---|
| Image Modified |
|
UI Step |
---|
After all the measures are added and all the data entry fields are filled out, the Assessment Submission step can be processed. Click the the Process button button at the top of the Measures tab or the Applicant Information tab. Tip |
---|
If there are any missing fields, a popup will appear notifying you of what is missing. |
|
UI Step |
---|
Once all of the required fields are filled out, move on the to the Reports tab as everything will be saved automatically in Measures. |
|
|
Aura - Tab |
---|
|
Panel |
---|
borderColor | #002D72 |
---|
bgColor | #F3F4F9 |
---|
titleColor | #ffffff |
---|
borderWidth | 1 |
---|
titleBGColor | #002D72 |
---|
borderStyle | none |
---|
title | Workscope Submission - Reports |
---|
|
|
Info |
---|
The instructions below provides guidance for contractors to generate reports. The reports tab is used to generate either the Customer Audit Report (required to give to customers to show the work recommend or proposed) and the Pre Install Audit report (which the customer will need to sign so the Contractor can upload during Final Project Submission. |
UI Steps |
---|
|
UI Step |
---|
On the Reports tab, click the Generate Reports button, a new Report dialog will open. Expand |
---|
| Image Modified |
|
UI Step |
---|
Select either the Customer Audit Report or Pre Install Audit report and click the OK button. Expand |
---|
| Image Modified |
|
UI Step |
---|
The reports will automatically download once they are generated. Reports can also be downloaded manually by clicking on the hyperlink under the Name column. Expand |
---|
| Image Modified |
|
|
|
|
|